Hello everyone,
please throw some light on this. When we give a start command to a gas turbine (say GE make, 19.6 MW, Frame-5, Mark-VIe control with prime mover is diesel engine), what are the steps through which it reaches FSNL (full speed no load). i.e., Functional description of starting of gas turbine. I just want to know details step-wise. Our machine is very old (1984), but upgraded gradually & most of old manuals are not available. I hope this is the best forum to learn this type of query.
Regards
please throw some light on this. When we give a start command to a gas turbine (say GE make, 19.6 MW, Frame-5, Mark-VIe control with prime mover is diesel engine), what are the steps through which it reaches FSNL (full speed no load). i.e., Functional description of starting of gas turbine. I just want to know details step-wise. Our machine is very old (1984), but upgraded gradually & most of old manuals are not available. I hope this is the best forum to learn this type of query.
Regards