The cable entry for the power to the heater 1 1/4" NPT, I just want to put it in a new location in the field.
Steps taken in field:
1) Drill hole.
2) Put the cable gland for the cable entry. Cable gland will have the appropriate area certification.
Is it possible to do that without hampering the certification?