B
I am doing an APC application with Honeywell Experion R4.1. I would like to schedule a function block (PID) to run once every 30 Min to 1 hour. Does anyone know a way to get around the 2 min maximum cycle time in the scheduler? Or an alternative method?
This is an APC application that for process reasons should run on a long cycle time. I could write my own PID control block in a CM with a scheduler, but would prefer to use one of the built in Experion functions.
[email protected]
This is an APC application that for process reasons should run on a long cycle time. I could write my own PID control block in a CM with a scheduler, but would prefer to use one of the built in Experion functions.
[email protected]